+ Chandeliers Wall Fixtures Fans Bathroom Outdoor Directional Lights Candle Chandeliers Chandelier Accessories Down Chandeliers Other Chandeliers Ring Chandeliers Up Chandeliers Sconces Other Wall Lights Outdoor Wall Lights Picture Display Lights Sconce Accessories Wall Sconces Belt Fans Ceiling Fans Ceiling Fans with Light Dual Motor Fans Fan Motor Without Blades Fandeliers Huggers Other Fans Outdoor Fans Portable Fans Wall Fans Bathroom Fixtures Bath Fans Bathroom Sconces Other Bathroom Fixtures Vanity Lights Address Numbers Bollards Deck Lights Door Bells Exterior Accessories Exterior Chandeliers Exterior Fans Exterior Flush Mounts Exterior Foyer / Hall Lanterns Exterior Pendants Exterior Semi-Flush Mounts Hanging Lanterns Mail Boxes Marine Lights Other Exterior Pier Mount Lights Pier Mounts Portable Lanterns Post Adaptors Post Mount Lights Posts Sconces Solar Lights Wall Lanterns Wall Lights Wind Chimes Directional Flush Mounts Directional Island Lights Directional Light Accessories Directional Light Sconces Directional Recessed Lights Directional Semi-Flush Mounts Directional Spot Lights Directional Wall Lights Mono Points Other Directional Lights Outdoor Directional Lights Marine Lights Puck Lights Security Lights Replacement Glass Mirrors Other Decor / Home Accents Door Bells Wind Chimes Alora Lighting Bulbrite CAL Lighting Corbett Craftmade Crystorama Dale Tiffany Dolan Designs ET2 Elco Lighting Elegant Fanimation Fine Art Handcrafted Lighting Fredrick Ramond Generation Lighting Golden Hi-Lite MFG Co. Hinkley House of Troy Hubbardton Forge Hudson Valley Justice Design Group Kalco Kichler Kuzco Lighting Inc Lark Legrand Maxim Melissa Lighting Meyda White Millennium Minka George Kovacs Minka Metropolitan Minka-Aire Minka-Lavery Mitzi by Hudson Valley Lighting Nuvo Satco Products Inc. Savoy House Savoy House Meridian Troy Uttermost Varaluz Visual Comfort & Co. Architectural Collection Visual Comfort & Co. Fan Collection Visual Comfort & Co. Modern Collection Visual Comfort & Co. Studio Collection Westinghouse
Hi, Sign In | Create Account Locations & Hours
Account Edit Account Account Information Default Billing Default Delivery User Name & Password Contacts Wishlists
+ Create A New Wishlist
Home About Us Contact Us Policies Shipping Policy Privacy Policy Return Policy Terms & Conditions mantecalighting@verizon.net

Copyright @ 2025 Manteca. All rights reserved.
Part Number: 9ZR4A / Vendor ID #: 75
Pre-Bent S Curve MonoRail
Call for Price
Availability
  • Manufacturer availability unknown.
Dimensions
Height: 0.60"
Width: 0.30"
Finish: Antique Bronze
Item Color 1: Brown
Master Color: Brown
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False